SW-IMS-FRM-005
Integrated Risk Register Template
Version
1.0
Owner
Risk Manager
Effective Date
TBD
Review Date
TBD
Integrated Risk Register Template
Purpose
This register provides a centralized, integrated view of all significant risks across quality, environmental, and information security domains. It enables systematic risk identification, assessment, treatment, and monitoring as part of Swedwise's Integrated Management System.
Instructions
- Maintain centrally: IMS Coordinator/Risk Manager maintains this register
- Update regularly: Review and update at least quarterly and after significant changes
- Risk IDs: Assign unique identifiers (R-YYYY-NNN) to each risk
- Treatment Plans: Create detailed treatment plans (SW-IMS-FRM-004) for high-priority risks
- Report: Include risk register summary in Management Reviews
Risk Assessment Criteria
Likelihood Ratings
| Rating | Level | Description | Frequency |
|---|---|---|---|
| 1 | Very Unlikely | Rare; may occur only in exceptional circumstances | < 5% probability annually |
| 2 | Unlikely | Could occur at some time | 5-25% probability annually |
| 3 | Possible | Might occur occasionally | 25-50% probability annually |
| 4 | Likely | Will probably occur in most circumstances | 50-75% probability annually |
| 5 | Very Likely | Expected to occur frequently | > 75% probability annually |
Impact Ratings
| Rating | Level | Description | Example Impacts |
|---|---|---|---|
| 1 | Negligible | Minimal impact; easily managed | Minor inconvenience; < 10k SEK cost |
| 2 | Minor | Limited impact; manageable with existing resources | Temporary customer dissatisfaction; 10-50k SEK cost |
| 3 | Moderate | Noticeable impact; requires management attention | Customer complaint; regulatory warning; 50-250k SEK cost |
| 4 | Major | Serious impact; significant disruption | Loss of major customer; regulatory fine; 250k-1M SEK cost |
| 5 | Critical | Severe impact; potential business failure | Multiple customer losses; certification loss; > 1M SEK cost |
Risk Score Matrix
Risk Score = Likelihood × Impact
| Risk Score | Risk Level | Action Required |
|---|---|---|
| 1-4 | Low | Monitor; accept risk; no formal treatment required |
| 5-9 | Medium | Active management; implement cost-effective controls |
| 10-14 | High | Develop treatment plan; allocate resources; senior management awareness |
| 15-25 | Critical | Immediate action; formal treatment plan; CEO/Board awareness |
Risk Treatment Options
- Avoid: Eliminate the risk by not undertaking the activity
- Reduce: Implement controls to reduce likelihood or impact
- Transfer: Share risk with third party (insurance, contracts, outsourcing)
- Accept: Acknowledge and accept the risk (with documented justification)
Integrated Risk Register
Register Owner: [Risk Manager / IMS Coordinator]
Last Updated: [YYYY-MM-DD]
Review Frequency: Quarterly (minimum)
Next Review Date: [YYYY-MM-DD]
Risk Entry Template
Complete the following for each identified risk:
| Field | Details |
|---|---|
| Risk ID | [R-YYYY-NNN] |
| Date Identified | [YYYY-MM-DD] |
| Identified By | |
| Risk Owner | [Person accountable for managing this risk] |
Risk Details
| Field | Details |
|---|---|
| Risk Category | [ ] Quality [ ] Environmental [ ] Information Security [ ] Strategic [ ] Operational [ ] Financial [ ] Compliance |
| ISO Standard(s) | [ ] ISO 9001 [ ] ISO 14001 [ ] ISO 27001 [ ] All [ ] N/A |
| Related Process/Area | [e.g., SaaS Operations, Customer Support, Data Management] |
Risk Description
Risk Statement:
[Use format: "If [event/condition], then [consequence], resulting in [impact]"]
Example: "If primary data center fails, then SaaS service becomes unavailable, resulting in SLA breach and customer compensation."
Inherent Risk Assessment (Before Controls)
| Factor | Rating | Notes |
|---|---|---|
| Likelihood | [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5 | |
| Impact | [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5 | |
| Inherent Risk Score | [Likelihood × Impact] |
Existing Controls
| Control Description | Type | Effectiveness | Owner |
|---|---|---|---|
| [ ] Preventive [ ] Detective [ ] Corrective |
[ ] Effective [ ] Partially Effective [ ] Ineffective |
||
| [ ] Preventive [ ] Detective [ ] Corrective |
[ ] Effective [ ] Partially Effective [ ] Ineffective |
||
| [ ] Preventive [ ] Detective [ ] Corrective |
[ ] Effective [ ] Partially Effective [ ] Ineffective |
Residual Risk Assessment (With Current Controls)
| Factor | Rating | Notes |
|---|---|---|
| Likelihood | [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5 | |
| Impact | [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5 | |
| Residual Risk Score | [Likelihood × Impact] | |
| Risk Level | [ ] Low [ ] Medium [ ] High [ ] Critical |
Risk Treatment
| Field | Details |
|---|---|
| Treatment Option | [ ] Avoid [ ] Reduce [ ] Transfer [ ] Accept |
| Treatment Status | [ ] No treatment required (accepted) [ ] Treatment planned [ ] Treatment in progress [ ] Treatment complete [ ] Under review |
| Treatment Plan Reference | [Link to SW-IMS-FRM-004 if applicable] |
| Planned Actions Summary | [Brief description of treatment actions] |
| Treatment Responsible | |
| Treatment Target Date |
Monitoring and Review
| Field | Details |
|---|---|
| Monitoring Method | [How is this risk tracked? KPIs, audits, reports?] |
| Monitoring Frequency | [ ] Daily [ ] Weekly [ ] Monthly [ ] Quarterly [ ] Annually |
| Last Review Date | |
| Next Review Date | |
| Review Trigger Events | [Events that would require immediate reassessment] |
Status and Notes
| Field | Details |
|---|---|
| Current Status | [ ] Active [ ] Under Control [ ] Escalated [ ] Closed |
| Trend | [ ] Increasing [ ] Stable [ ] Decreasing |
| Incidents/Near Misses | [Has this risk materialized? References to incidents.] |
| Additional Notes |
Risk Register Summary
Completion Date: [YYYY-MM-DD]
Summary Statistics:
| Risk Level | Count | Percentage |
|---|---|---|
| Critical (15-25) | ||
| High (10-14) | ||
| Medium (5-9) | ||
| Low (1-4) | ||
| Total Risks | 100% |
Breakdown by Category:
| Category | Count |
|---|---|
| Quality | |
| Environmental | |
| Information Security | |
| Strategic | |
| Operational | |
| Financial | |
| Compliance | |
| Total |
Breakdown by ISO Standard:
| Standard | Count |
|---|---|
| ISO 9001 (Quality) | |
| ISO 14001 (Environmental) | |
| ISO 27001 (Information Security) | |
| Multiple/Integrated | |
| Total |
Treatment Status:
| Status | Count |
|---|---|
| No treatment required (accepted) | |
| Treatment planned | |
| Treatment in progress | |
| Treatment complete | |
| Under review | |
| Total |
Top Risks Requiring Attention
List the highest-priority risks requiring management focus:
| Risk ID | Risk Description (Brief) | Risk Score | Treatment Status | Owner |
|---|---|---|---|---|
Risk Register Approval
Reviewed and Approved By:
| Name | Role | Date | Signature |
|---|---|---|---|
| Risk Manager / IMS Coordinator | |||
| CEO / Management Team |
Next Scheduled Review: [YYYY-MM-DD]
Change Log
Record significant changes to the risk register:
| Date | Change Description | Changed By | Approved By |
|---|---|---|---|
| Risk register created | |||
Notes for Users
When to Update the Risk Register
Update the register when:
- New risks identified: Risk assessments, audits, incidents, strategic changes
- Risk levels change: Circumstances change affecting likelihood or impact
- Controls change: New controls implemented or existing controls fail
- Treatment completed: Treatment plans are finished and effectiveness verified
- Risks materialize: Risk events occur (cross-reference incidents)
- Periodic reviews: At least quarterly and before management reviews
- Organizational changes: Mergers, new services, regulatory changes
Risk Identification Sources
- Internal audits: Audit findings, process observations
- External audits: Certification body findings
- Incident reports: Security incidents, quality issues, environmental events
- Context analysis: PESTLE, SWOT, stakeholder analysis
- Process reviews: Process owners identify risks in their areas
- Staff input: Frontline staff often see risks management misses
- Customer feedback: Complaints, surveys, contract reviews
- Supplier issues: Supply chain disruptions, vendor performance
- Regulatory changes: New laws, industry standards, contractual obligations
- Technology changes: System upgrades, new tools, infrastructure changes
Risk Ownership
Risk Owners are responsible for:
- Monitoring the risk and existing controls
- Ensuring controls remain effective
- Initiating treatment actions when needed
- Reporting changes in risk level
- Providing updates for management reviews
Risk Owners should:
- Have authority over the affected process/area
- Have resources to manage the risk
- Understand the risk and its potential impacts
- Be accountable for risk treatment
Integration Across Standards
Many risks span multiple management system domains:
Example: Data Breach
- Quality (ISO 9001): Customer dissatisfaction, loss of trust
- Environmental (ISO 14001): Potentially N/A unless environmental data involved
- Information Security (ISO 27001): Confidentiality breach, compliance failure
Capture these as integrated risks rather than separate entries to avoid duplication and ensure holistic treatment.
Risk Appetite
Swedwise's general risk appetite:
- Low tolerance: Risks affecting customer data security, regulatory compliance, business continuity
- Moderate tolerance: Risks affecting operational efficiency, reputation, moderate financial impact
- Higher tolerance: Risks related to innovation, market expansion, efficiency improvements (calculated risks)
Specific risk appetites should be defined in the Risk Management Procedure (SW-IMS-PRO-005).
Escalation
Escalate risks to management when:
- Risk score is Critical (15-25) or High (10-14)
- Risk trend is increasing despite treatment
- Risk materializes (incident occurs)
- Treatment requires significant resources or strategic decisions
- External factors significantly change the risk landscape
Document Control
| Version | Date | Author | Changes | Approved By |
|---|---|---|---|---|
| 1.0 | [TBD] | Risk Manager | Initial template creation | [TBD] |
Next Review Date: [TBD]
Document Classification: Internal
Document Owner: Risk Manager