Integrated Risk Register Template

Version

1.0

Owner

Risk Manager

Effective Date

TBD

Review Date

TBD

Integrated Risk Register Template

Purpose

This register provides a centralized, integrated view of all significant risks across quality, environmental, and information security domains. It enables systematic risk identification, assessment, treatment, and monitoring as part of Swedwise's Integrated Management System.

Instructions

  1. Maintain centrally: IMS Coordinator/Risk Manager maintains this register
  2. Update regularly: Review and update at least quarterly and after significant changes
  3. Risk IDs: Assign unique identifiers (R-YYYY-NNN) to each risk
  4. Treatment Plans: Create detailed treatment plans (SW-IMS-FRM-004) for high-priority risks
  5. Report: Include risk register summary in Management Reviews

Risk Assessment Criteria

Likelihood Ratings

Rating Level Description Frequency
1 Very Unlikely Rare; may occur only in exceptional circumstances < 5% probability annually
2 Unlikely Could occur at some time 5-25% probability annually
3 Possible Might occur occasionally 25-50% probability annually
4 Likely Will probably occur in most circumstances 50-75% probability annually
5 Very Likely Expected to occur frequently > 75% probability annually

Impact Ratings

Rating Level Description Example Impacts
1 Negligible Minimal impact; easily managed Minor inconvenience; < 10k SEK cost
2 Minor Limited impact; manageable with existing resources Temporary customer dissatisfaction; 10-50k SEK cost
3 Moderate Noticeable impact; requires management attention Customer complaint; regulatory warning; 50-250k SEK cost
4 Major Serious impact; significant disruption Loss of major customer; regulatory fine; 250k-1M SEK cost
5 Critical Severe impact; potential business failure Multiple customer losses; certification loss; > 1M SEK cost

Risk Score Matrix

Risk Score = Likelihood × Impact

Risk Score Risk Level Action Required
1-4 Low Monitor; accept risk; no formal treatment required
5-9 Medium Active management; implement cost-effective controls
10-14 High Develop treatment plan; allocate resources; senior management awareness
15-25 Critical Immediate action; formal treatment plan; CEO/Board awareness

Risk Treatment Options

  • Avoid: Eliminate the risk by not undertaking the activity
  • Reduce: Implement controls to reduce likelihood or impact
  • Transfer: Share risk with third party (insurance, contracts, outsourcing)
  • Accept: Acknowledge and accept the risk (with documented justification)

Integrated Risk Register

Register Owner: [Risk Manager / IMS Coordinator]

Last Updated: [YYYY-MM-DD]

Review Frequency: Quarterly (minimum)

Next Review Date: [YYYY-MM-DD]


Risk Entry Template

Complete the following for each identified risk:

Field Details
Risk ID [R-YYYY-NNN]
Date Identified [YYYY-MM-DD]
Identified By
Risk Owner [Person accountable for managing this risk]

Risk Details

Field Details
Risk Category [ ] Quality [ ] Environmental [ ] Information Security [ ] Strategic [ ] Operational [ ] Financial [ ] Compliance
ISO Standard(s) [ ] ISO 9001 [ ] ISO 14001 [ ] ISO 27001 [ ] All [ ] N/A
Related Process/Area [e.g., SaaS Operations, Customer Support, Data Management]

Risk Description

Risk Statement:

[Use format: "If [event/condition], then [consequence], resulting in [impact]"]

Example: "If primary data center fails, then SaaS service becomes unavailable, resulting in SLA breach and customer compensation."

Inherent Risk Assessment (Before Controls)

Factor Rating Notes
Likelihood [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5
Impact [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5
Inherent Risk Score [Likelihood × Impact]

Existing Controls

Control Description Type Effectiveness Owner
[ ] Preventive
[ ] Detective
[ ] Corrective
[ ] Effective
[ ] Partially Effective
[ ] Ineffective
[ ] Preventive
[ ] Detective
[ ] Corrective
[ ] Effective
[ ] Partially Effective
[ ] Ineffective
[ ] Preventive
[ ] Detective
[ ] Corrective
[ ] Effective
[ ] Partially Effective
[ ] Ineffective

Residual Risk Assessment (With Current Controls)

Factor Rating Notes
Likelihood [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5
Impact [ ] 1 [ ] 2 [ ] 3 [ ] 4 [ ] 5
Residual Risk Score [Likelihood × Impact]
Risk Level [ ] Low [ ] Medium [ ] High [ ] Critical

Risk Treatment

Field Details
Treatment Option [ ] Avoid [ ] Reduce [ ] Transfer [ ] Accept
Treatment Status [ ] No treatment required (accepted)
[ ] Treatment planned
[ ] Treatment in progress
[ ] Treatment complete
[ ] Under review
Treatment Plan Reference [Link to SW-IMS-FRM-004 if applicable]
Planned Actions Summary [Brief description of treatment actions]
Treatment Responsible
Treatment Target Date

Monitoring and Review

Field Details
Monitoring Method [How is this risk tracked? KPIs, audits, reports?]
Monitoring Frequency [ ] Daily [ ] Weekly [ ] Monthly [ ] Quarterly [ ] Annually
Last Review Date
Next Review Date
Review Trigger Events [Events that would require immediate reassessment]

Status and Notes

Field Details
Current Status [ ] Active [ ] Under Control [ ] Escalated [ ] Closed
Trend [ ] Increasing [ ] Stable [ ] Decreasing
Incidents/Near Misses [Has this risk materialized? References to incidents.]
Additional Notes

Risk Register Summary

Completion Date: [YYYY-MM-DD]

Summary Statistics:

Risk Level Count Percentage
Critical (15-25)
High (10-14)
Medium (5-9)
Low (1-4)
Total Risks 100%

Breakdown by Category:

Category Count
Quality
Environmental
Information Security
Strategic
Operational
Financial
Compliance
Total

Breakdown by ISO Standard:

Standard Count
ISO 9001 (Quality)
ISO 14001 (Environmental)
ISO 27001 (Information Security)
Multiple/Integrated
Total

Treatment Status:

Status Count
No treatment required (accepted)
Treatment planned
Treatment in progress
Treatment complete
Under review
Total

Top Risks Requiring Attention

List the highest-priority risks requiring management focus:

Risk ID Risk Description (Brief) Risk Score Treatment Status Owner

Risk Register Approval

Reviewed and Approved By:

Name Role Date Signature
Risk Manager / IMS Coordinator
CEO / Management Team

Next Scheduled Review: [YYYY-MM-DD]


Change Log

Record significant changes to the risk register:

Date Change Description Changed By Approved By
Risk register created

Notes for Users

When to Update the Risk Register

Update the register when:

  • New risks identified: Risk assessments, audits, incidents, strategic changes
  • Risk levels change: Circumstances change affecting likelihood or impact
  • Controls change: New controls implemented or existing controls fail
  • Treatment completed: Treatment plans are finished and effectiveness verified
  • Risks materialize: Risk events occur (cross-reference incidents)
  • Periodic reviews: At least quarterly and before management reviews
  • Organizational changes: Mergers, new services, regulatory changes

Risk Identification Sources

  • Internal audits: Audit findings, process observations
  • External audits: Certification body findings
  • Incident reports: Security incidents, quality issues, environmental events
  • Context analysis: PESTLE, SWOT, stakeholder analysis
  • Process reviews: Process owners identify risks in their areas
  • Staff input: Frontline staff often see risks management misses
  • Customer feedback: Complaints, surveys, contract reviews
  • Supplier issues: Supply chain disruptions, vendor performance
  • Regulatory changes: New laws, industry standards, contractual obligations
  • Technology changes: System upgrades, new tools, infrastructure changes

Risk Ownership

Risk Owners are responsible for:

  • Monitoring the risk and existing controls
  • Ensuring controls remain effective
  • Initiating treatment actions when needed
  • Reporting changes in risk level
  • Providing updates for management reviews

Risk Owners should:

  • Have authority over the affected process/area
  • Have resources to manage the risk
  • Understand the risk and its potential impacts
  • Be accountable for risk treatment

Integration Across Standards

Many risks span multiple management system domains:

Example: Data Breach

  • Quality (ISO 9001): Customer dissatisfaction, loss of trust
  • Environmental (ISO 14001): Potentially N/A unless environmental data involved
  • Information Security (ISO 27001): Confidentiality breach, compliance failure

Capture these as integrated risks rather than separate entries to avoid duplication and ensure holistic treatment.

Risk Appetite

Swedwise's general risk appetite:

  • Low tolerance: Risks affecting customer data security, regulatory compliance, business continuity
  • Moderate tolerance: Risks affecting operational efficiency, reputation, moderate financial impact
  • Higher tolerance: Risks related to innovation, market expansion, efficiency improvements (calculated risks)

Specific risk appetites should be defined in the Risk Management Procedure (SW-IMS-PRO-005).

Escalation

Escalate risks to management when:

  • Risk score is Critical (15-25) or High (10-14)
  • Risk trend is increasing despite treatment
  • Risk materializes (incident occurs)
  • Treatment requires significant resources or strategic decisions
  • External factors significantly change the risk landscape

Document Control

Version Date Author Changes Approved By
1.0 [TBD] Risk Manager Initial template creation [TBD]

Next Review Date: [TBD]

Document Classification: Internal

Document Owner: Risk Manager