Purpose
This section of the IMS Manual describes how Swedwise AB continually improves the suitability, adequacy, and effectiveness of the Integrated Management System. It addresses Clause 10 (Improvement) requirements for ISO 9001, ISO 14001, and ISO 27001.
Continual improvement is embedded in Swedwise's culture and operations, aligned with the company's tagline: "Make Time For The Good" – by working smarter and continuously improving, we create capacity for value-adding activities.
10.1 General - Commitment to Improvement
10.1.1 Improvement Culture
Swedwise is committed to continually improving the effectiveness and efficiency of the Integrated Management System. This commitment is demonstrated through:
Leadership commitment:
- Management establishes and communicates improvement objectives
- Resources allocated for improvement initiatives
- Improvement recognized and celebrated
- Learning from both successes and failures
Staff empowerment:
- All staff encouraged to identify and suggest improvements
- Improvement suggestions welcomed and evaluated fairly
- Staff empowered to implement improvements within their authority
- No-blame culture for reporting issues and mistakes
Learning organization:
- Aligned with "The Machine" framework (agility, autonomy, continuous learning)
- Knowledge sharing through discipline forums
- Lessons learned captured and disseminated
- Innovation and experimentation encouraged
Data-driven improvement:
- Decisions based on facts, data, and analysis
- Performance metrics drive improvement priorities
- Trends analyzed to identify systemic opportunities
- Effectiveness of improvements measured
10.1.2 Improvement Objectives
Swedwise establishes specific improvement objectives across all IMS disciplines:
Quality improvement objectives (examples):
- Reduce customer complaint rate by 20% year-over-year
- Increase customer satisfaction score from 4.0 to 4.3
- Improve project on-time delivery rate to 95%
- Reduce project rework hours by 15%
Environmental improvement objectives (examples):
- Reduce business travel carbon emissions by 10% annually
- Increase proportion of virtual meetings to 80%
- Reduce office energy consumption by 5% per employee
- Achieve 95% e-waste recycling rate
Information security improvement objectives (examples):
- Reduce security incident response time to <10 minutes (average)
- Achieve 100% security training completion (annual)
- Reduce phishing simulation click rate to <5%
- Automate 80% of routine security controls
IMS efficiency improvement objectives (examples):
- Reduce average corrective action closure time by 25%
- Achieve 100% on-time internal audit completion
- Implement 20+ documented improvements annually
- Reduce document approval cycle time by 30%
10.1.3 Improvement Opportunities - Sources
Swedwise identifies improvement opportunities from multiple sources:
| Source | Description | Frequency | Owner |
|---|---|---|---|
| Management Review | Strategic improvement decisions from management review (SW-IMS-PRO-004) | Quarterly | Management Team |
| Internal and External Audits | Audit findings, observations, best practices identified | Per audit schedule | IMS Owner, Auditors |
| Nonconformities and Incidents | Root cause analysis revealing systemic issues (SW-IMS-PRO-005) | Continuous | Process Owners, CISO |
| Customer Feedback | Complaints, suggestions, satisfaction survey themes (SW-QMS-PRO-002) | Continuous | Quality Lead, CSM |
| Employee Suggestions | Staff improvement ideas via suggestion process | Continuous | All Staff |
| Data Analysis | Performance trends, KPI gaps, benchmarking insights | Monthly/Quarterly | IMS Owner, Department Heads |
| Risk Assessment | Risks and opportunities identified in risk assessment (SW-IMS-PRO-002) | Annually, or as needed | Risk Manager, CISO |
| Benchmarking | Comparison with industry best practices, standards updates | Annually | Quality Lead, CISO |
| Innovation and R&D | New technologies, methodologies, tools | Ongoing | Technical Leads, Discipline Forums |
| Supplier Feedback | Suggestions from partners and suppliers | Ad-hoc | Procurement Lead |
10.2 Nonconformity and Corrective Action
10.2.1 Purpose and Scope
When a nonconformity occurs (including from customer complaints or incidents), Swedwise:
- Reacts promptly to control and correct the nonconformity
- Evaluates the need for action to eliminate root causes
- Implements corrective actions to prevent recurrence
- Verifies effectiveness of corrective actions
- Updates the IMS if necessary
Nonconformity = Non-fulfillment of a requirement (ISO, legal, customer, internal).
Corrective action = Action to eliminate the root cause of a nonconformity and prevent recurrence.
See SW-IMS-PRO-005 (Nonconformity and Corrective Action Procedure) for complete process.
10.2.2 Reacting to Nonconformity
When a nonconformity occurs, Swedwise takes immediate action:
1. Control and correction (containment):
- Take immediate action to contain the nonconformity
- Fix the immediate problem (the symptom)
- Prevent further impact on customers, environment, or security
Examples:
- Service outage: Restore service, notify affected customers
- Project deliverable defect: Rework and resubmit
- Security incident: Contain breach, revoke compromised access
- Environmental spill: Contain, clean up, notify authorities
2. Deal with consequences:
- Assess impact on customers, environment, security, compliance
- Customer notification and recovery actions
- Service credits or compensation (if contractual)
- Regulatory notification (if required by law)
Responsibility: Process Owner, Department Head, or person identifying the nonconformity
Timeline: Immediate to within 24 hours (depending on severity)
10.2.3 Evaluating the Need for Corrective Action
Swedwise evaluates whether corrective action is needed to eliminate root causes:
Evaluation criteria:
- Severity: How significant is the impact? (Critical, Major, Minor)
- Recurrence risk: Is this likely to happen again?
- Systemic vs. isolated: One-time error or systemic issue?
- Cost-benefit: Does benefit of corrective action justify effort?
Decision:
- Corrective Action Required: For major nonconformities, systemic issues, high recurrence risk, legal violations
- Correction Only: For minor, isolated issues with low recurrence risk
- Observation/Monitor: For borderline issues; track for trends
Examples:
- Major NC requiring corrective action: No risk assessments conducted in 18 months (systemic failure)
- Minor NC requiring corrective action: Missing training records for 3 employees (pattern if recurring)
- Correction only: One-time typo in document (isolated, low risk)
10.2.4 Implementing Corrective Action
Corrective action process (8 steps):
1. IDENTIFY → 2. RECORD → 3. CONTAIN → 4. ANALYZE ROOT CAUSE →
5. PLAN CORRECTIVE ACTION → 6. IMPLEMENT → 7. VERIFY EFFECTIVENESS → 8. CLOSE
Step 1: Identify Nonconformity
- Recognize that a requirement has not been met
- Gather evidence
Step 2: Record Nonconformity
- Create Corrective Action Request (CAR) with unique ID
- Document: description, evidence, requirement not met, classification
- Assign CAR Owner (responsible for managing CAR to closure)
Step 3: Contain (Immediate Correction)
- Fix the immediate problem
- Prevent further impact
- Assess scope (are other areas affected?)
Step 4: Analyze Root Cause
- Investigate why the nonconformity occurred
- Use root cause analysis techniques:
- 5 Whys: Iteratively ask "why" to drill down to root cause
- Fishbone Diagram: Identify potential causes across categories (People, Process, Technology, Environment, Management)
- Timeline analysis: Reconstruct sequence of events
- Distinguish between symptoms and root causes
- Validate root cause with evidence
Example Root Cause Analysis (5 Whys):
- NC: Quarterly access reviews not performed for 6 accounts
- Why? Reminders not set up
- Why? IT admin who set reminders left the company
- Why? Knowledge not transferred before departure
- Why? No documented handover procedure
- Why? Role responsibilities not clearly defined
- ROOT CAUSE: Lack of documented role responsibilities and handover procedures for IT admin
Step 5: Plan Corrective Action
- Develop corrective action plan addressing the root cause
- Define specific actions, responsibilities, deadlines, resources, success criteria
- Obtain approvals:
- Minor NC: CAR Owner approval
- Major NC: Department Head + IMS Owner approval
- Critical NC: Management Team approval
Example Corrective Action Plan:
| Action | Responsible | Deadline | Resources | Success Criteria |
|---|---|---|---|---|
| Document IT Admin role with access review responsibilities | CISO | 2025-03-15 | 4 hours | Role description published (SW-ISMS-ROLE-002) |
| Create IT Admin handover checklist | CISO | 2025-03-15 | 2 hours | Checklist available |
| Implement automated access review reminders | IT Admin | 2025-04-01 | 8 hours | Reminders auto-generate quarterly |
| Knowledge transfer session with IT Admin | IT Lead | 2025-03-30 | 2 hours | Session documented |
Step 6: Implement Corrective Action
- Execute corrective action plan
- Update procedures, work instructions, forms
- Communicate changes to affected personnel
- Provide training if needed
- Collect evidence of implementation
Timeline:
- Critical NC: 7 days
- Major NC: 30 days
- Minor NC: 60 days
- Extensions granted by IMS Owner with justification
Step 7: Verify Effectiveness
- Review evidence that corrective actions were implemented
- Assess whether nonconformity is prevented from recurring
- Effectiveness check timing:
- Immediate verification (within 30 days): Implementation complete?
- Sustained effectiveness (3-6 months): Still working? No recurrence?
- Determine: Effective / Partially Effective / Ineffective
Effectiveness verification methods:
- Document review (updated procedures, records)
- Interviews (staff awareness, compliance)
- Observations (process in action)
- Data review (KPIs improved?)
- Follow-up audit (targeted re-audit)
Step 8: Close Nonconformity
- Confirm all corrective actions implemented
- Confirm effectiveness verified
- Update CAR status to Closed
- Record closure date and approver
- File CAR and evidence
- Communicate closure
- Share lessons learned
If ineffective: Reopen CAR; require revised corrective action plan; restart from Step 5.
10.2.5 Reviewing and Updating the IMS
If corrective actions reveal need for changes to the IMS:
Update documented information:
- Revise policies, procedures, work instructions
- Update forms or templates
- Amend process documentation
Update risk assessment:
- Add new risks identified
- Adjust risk treatments
Communicate changes:
- Inform affected personnel
- Provide training on updated processes
- Cascade through organizational units
Examples:
- Corrective action for missing training records → Update Competence and Training Procedure (SW-IMS-PRO-014) to include automated tracking
- Corrective action for security incident → Update Incident Management Procedure (SW-ISMS-PRO-002) with new response playbook
10.2.6 Retaining Documented Information
Records maintained:
- Nature of nonconformities
- Actions taken (correction, corrective action)
- Results of corrective actions (effectiveness verification)
- CAR forms and supporting evidence
- Root cause analysis documentation
Retention: 7 years (for CARs and nonconformity records)
Location: Nonconformity register and CAR repository (SW-IMS-FRM-007, SW-IMS-FRM-008)
Responsibility: IMS Owner maintains register; CAR Owner maintains evidence
10.3 Continual Improvement
10.3.1 Commitment to Continual Improvement
Swedwise continually improves the suitability, adequacy, and effectiveness of the IMS, considering:
Suitability: Is the IMS appropriate for our organization's purpose, context, and strategic direction?
Adequacy: Is the IMS sufficient to meet requirements and achieve objectives?
Effectiveness: Does the IMS enable us to achieve intended results?
Continual improvement focuses on:
- Enhancing customer satisfaction
- Reducing environmental impact
- Strengthening information security
- Improving process efficiency and effectiveness
- Reducing waste and errors
- Increasing employee engagement and competence
- Optimizing resource utilization
10.3.2 Continual Improvement Methodology
Swedwise uses the Plan-Do-Check-Act (PDCA) cycle for continual improvement:
┌──────────────────────────────────────────────┐
│ PLAN │
│ - Identify improvement opportunity │
│ - Analyze current state and root causes │
│ - Set improvement objective and target │
│ - Develop improvement plan │
└──────────────────┬───────────────────────────┘
│
▼
┌──────────────────────────────────────────────┐
│ DO │
│ - Implement improvement actions │
│ - Pilot or test on small scale if possible │
│ - Collect data during implementation │
└──────────────────┬───────────────────────────┘
│
▼
┌──────────────────────────────────────────────┐
│ CHECK │
│ - Measure results against objective/target │
│ - Analyze effectiveness of improvement │
│ - Identify gaps or unexpected consequences │
└──────────────────┬───────────────────────────┘
│
▼
┌──────────────────────────────────────────────┐
│ ACT │
│ - If successful: Standardize and communicate │
│ - If not successful: Adjust and re-plan │
│ - Identify further improvement opportunities │
└──────────────────────────────────────────────┘
│
└───────► Back to PLAN (continuous cycle)
10.3.3 Continual Improvement Process
See SW-IMS-PRO-009 (Continual Improvement Procedure) for detailed process.
Summary of improvement process:
1. Identify Improvement Opportunity
- From sources listed in Section 10.1.3
- Capture in improvement suggestion form (SW-IMS-FRM-002)
2. Evaluate Improvement Suggestion
- IMS Owner or Quality Lead reviews suggestion
- Assess: Impact, feasibility, resource requirements, alignment with objectives
- Decision: Approve, Reject, Defer, Request More Information
3. Plan Improvement
- Define improvement objective (what do we want to achieve?)
- Set target (how much improvement? by when?)
- Develop improvement plan (actions, responsibilities, timeline, resources)
- Identify success criteria (how will we know it worked?)
- Obtain approvals and resource allocation
4. Implement Improvement
- Execute improvement plan
- Update procedures, tools, systems as needed
- Communicate changes to affected personnel
- Provide training if required
- Pilot on small scale if high-risk or complex
5. Measure Effectiveness
- Collect data before and after improvement
- Compare results against target
- Assess: Did we achieve the improvement objective?
- Document outcomes (quantitative and qualitative)
6. Standardize and Communicate
- If successful: Embed improvement into standard practice
- Update documented information (procedures, work instructions)
- Train all relevant staff
- Monitor to ensure sustained improvement
- If not successful: Analyze why; adjust and retry, or abandon
7. Share Lessons Learned
- Document improvement case study
- Share success stories with organization (recognition)
- Present best practices in team meetings or forums
- Input to knowledge base
8. Identify Next Improvement
- Continuous cycle: What can we improve next?
- Build a culture of incremental, ongoing improvement
10.3.4 Types of Improvement
Incremental improvement (Kaizen):
- Small, continuous improvements
- Empowered teams and individuals
- Low cost, low risk
- Examples: Process tweaks, waste reduction, efficiency gains
Breakthrough improvement:
- Major, transformational changes
- Typically management-driven
- Higher investment and risk
- Examples: New technology platform, major process redesign, organizational restructuring
Swedwise emphasizes incremental improvement (aligned with learning organization culture) while also pursuing strategic breakthrough improvements when warranted.
10.3.5 Improvement Tools and Techniques
Swedwise employs various tools and techniques for improvement:
| Tool/Technique | Purpose | Use Case |
|---|---|---|
| PDCA Cycle | Structured improvement methodology | All improvement initiatives |
| Root Cause Analysis (5 Whys, Fishbone) | Identify underlying causes | Problem-solving, corrective action |
| Benchmarking | Compare against best practices | Identify performance gaps and opportunities |
| Process Mapping | Visualize and analyze processes | Identify bottlenecks, waste, handoffs |
| Lean Thinking | Eliminate waste, add value | Process efficiency, waste reduction |
| Brainstorming | Generate ideas | Improvement ideation sessions |
| Piloting/Testing | Test improvement on small scale | Reduce risk of large-scale changes |
| Data Analysis and Trends | Identify patterns and opportunities | Performance analysis, trend spotting |
| Customer Journey Mapping | Understand customer experience | Improve customer satisfaction |
| Before-and-After Metrics | Measure improvement impact | Effectiveness verification |
10.3.6 Improvement Metrics and Targets
Swedwise tracks improvement activity and impact:
Improvement activity metrics:
| Metric | Target | Purpose |
|---|---|---|
| Improvement Suggestions Submitted | ≥ 30 per year | Gauge engagement and culture |
| Improvement Suggestions Implemented | ≥ 20 per year | Actual improvement activity |
| Implementation Rate | ≥ 60% | Quality of suggestions and evaluation |
| Average Time to Implement | ≤ 90 days | Responsiveness and efficiency |
| Staff Participation | ≥ 50% of staff submit at least 1 suggestion/year | Broad cultural engagement |
Improvement impact metrics:
- Measured per improvement objective (see Section 10.1.2)
- Before-and-after comparison
- Cost savings or revenue gains (where applicable)
- Customer satisfaction improvement
- Environmental impact reduction
- Security risk reduction
- Process efficiency gains
Reporting:
- Improvement metrics reported quarterly in Management Review
- Annual improvement summary shared with all staff
- Success stories highlighted (recognition and learning)
10.3.7 Recognition and Rewards
Swedwise recognizes and celebrates improvement contributions:
Recognition methods:
- Public acknowledgment in team meetings or company communications
- "Improvement of the Quarter" or "Innovation Award" (if formalized)
- Management appreciation and feedback
- Feature improvement case studies in internal newsletter or intranet
- Input to performance reviews (improvement contributions valued)
Culture of appreciation:
- Focus on learning and improvement, not blame
- Celebrate small wins and incremental improvements
- Recognize effort and creativity, not just results
- Encourage experimentation (safe to fail)
10.3.8 Improvement Examples
Examples of continual improvement at Swedwise (illustrative):
| Improvement | Problem/Opportunity | Action Taken | Result |
|---|---|---|---|
| Automated Training Tracking | Manual training tracking time-consuming; low completion visibility | Implement automated training dashboard in HRIS | 100% visibility; 30% reduction in admin time; 95%→100% completion |
| Virtual Meeting Culture | High business travel carbon emissions; consultant fatigue | Promote virtual-first meetings; invest in better collaboration tools | 25% reduction in travel; 15% CO2 reduction; improved work-life balance |
| Proactive SaaS Monitoring | Reactive incident response; customer-reported issues | Implement proactive monitoring with alerting | 50% reduction in customer-reported incidents; faster MTTR |
| Customer Onboarding Checklist | Inconsistent onboarding experience; missed steps | Standardized checklist for SaaS onboarding | Consistent experience; 20% faster onboarding; higher satisfaction |
| Access Review Automation | Quarterly access reviews manual and time-consuming | Automate access review report generation | 70% time savings; 100% on-time completion |
| Incident Response Playbooks | Inconsistent security incident response | Develop incident playbooks for common scenarios | Faster response; reduced stress; better documentation |
10.4 Improvement Governance
10.4.1 Roles and Responsibilities
| Role | Improvement Responsibilities |
|---|---|
| Management Team | - Approve strategic improvement initiatives - Allocate resources for improvement - Champion improvement culture - Review improvement metrics in management review - Recognize and reward improvement contributions |
| IMS Owner | - Coordinate continual improvement process - Evaluate improvement suggestions - Track improvement initiatives to completion - Report improvement metrics - Facilitate sharing of lessons learned - Maintain improvement register |
| Quality Lead | - Identify quality improvement opportunities - Support quality-focused improvement initiatives - Analyze customer feedback for improvement themes - Benchmark quality performance |
| Environmental Lead | - Identify environmental improvement opportunities - Support environmental improvement initiatives - Track environmental performance improvements - Promote sustainability initiatives |
| CISO | - Identify information security improvement opportunities - Support security improvement initiatives - Track security performance improvements - Stay current on security innovations |
| Department Heads | - Identify improvement opportunities in their areas - Support and resource improvement initiatives - Implement improvements in their departments - Encourage staff to submit improvement suggestions |
| All Staff | - Identify and suggest improvements - Participate in improvement initiatives - Implement improvements within their authority - Adopt standardized improvements - Share lessons learned |
10.4.2 Improvement Register
All improvement initiatives tracked in Improvement Register (SW-IMS-FRM-009):
| Improvement ID | Title | Submitted By | Date | Status | Owner | Target Date | Outcome |
|---|---|---|---|---|---|---|---|
| IMP-2025-001 | Automate training tracking | HR Manager | 2025-01-15 | Completed | HR Manager | 2025-03-31 | 100% completion visibility |
| IMP-2025-002 | Virtual-first meeting policy | Environmental Lead | 2025-02-01 | In Progress | CEO | 2025-06-30 | [TBD] |
Status values: Submitted, Approved, In Progress, Implemented, Verified, Closed, Deferred, Rejected
Location: [TBD - Document management system or improvement tracking tool]
Responsibility: IMS Owner maintains register and tracks progress
10.5 Integration with Risk and Opportunity Management
Improvement and risk management are closely linked:
Opportunities from risk assessment:
- Risk assessment (SW-IMS-PRO-002) identifies opportunities as well as risks
- Opportunities to improve performance, customer satisfaction, environmental performance, security
- Opportunities captured and evaluated like other improvement suggestions
Preventive action:
- Addressing risks before they materialize is a form of preventive improvement
- Example: Trend analysis identifies potential issue → implement improvement to prevent nonconformity
Risk treatment as improvement:
- Implementing risk treatments often improves processes
- Example: Implementing MFA reduces security risk AND improves authentication process
Improvement as risk reduction:
- Process improvements often reduce risks
- Example: Automating manual process reduces human error risk
Integrated approach:
- Risk assessment and improvement planning coordinated
- Management review considers risks and improvement opportunities together
- IMS Owner coordinates risk and improvement activities
10.6 Innovation and Learning
10.6.1 Learning from Experience
Swedwise systematically learns from:
Project retrospectives:
- Post-project review: What went well? What could be improved?
- Lessons learned documented and shared
- Best practices identified and disseminated
Incident post-mortems:
- Blameless post-incident review for significant incidents
- Focus on system and process improvements, not individual blame
- Findings shared to prevent recurrence across organization
Audit findings:
- Internal and external audit recommendations evaluated for improvement opportunities
- Positive findings (best practices) shared as examples
Benchmarking:
- Compare performance against industry standards, peers, competitors
- Identify gaps and improvement opportunities
- Adopt best practices from external sources
Industry developments:
- Monitor standards updates (ISO revisions)
- Stay current on technology innovations
- Engage with professional communities and interest groups
10.6.2 Knowledge Management
Swedwise captures and shares knowledge to enable learning and improvement:
Knowledge repositories:
- Document management system (procedures, guidelines, templates)
- Knowledge base (FAQs, troubleshooting guides, how-tos)
- Lessons learned database (project and incident insights)
- Training materials (on-demand learning resources)
Knowledge sharing mechanisms:
- Discipline Forums: Regular meetings of technical communities (OpenText, Salesforce, etc.) to share expertise
- Team Meetings: Sharing updates, lessons learned, best practices
- Lunch & Learns: Informal knowledge sharing sessions
- Onboarding and Mentoring: New staff learn from experienced colleagues
- Documentation: Written knowledge accessible to all
"The Machine" framework alignment:
- Autonomous teams empowered to learn and improve
- Decentralized decision-making with centralized knowledge sharing
- Psychological safety to admit mistakes and learn from them
- Continuous learning as a cultural value
10.7 Improvement Records
Records maintained:
| Record | Retention Period | Location | Owner |
|---|---|---|---|
| Improvement Suggestions (SW-IMS-FRM-002) | 5 years | Improvement register | IMS Owner |
| Improvement Register (SW-IMS-FRM-009) | Permanent (current + 5 years archived) | Improvement tracking system | IMS Owner |
| Improvement Plans and Evidence | 5 years | Improvement project files | Improvement Owner |
| Lessons Learned | 5 years | Knowledge base | Process Owner, Project Manager |
| Benchmarking Reports | 3 years | Analysis repository | Quality Lead, CISO |
| Management Review Improvement Decisions | 7 years | Management review minutes | IMS Owner |
10.8 Related Documents
Procedures:
- SW-IMS-PRO-002: Risk Assessment Procedure
- SW-IMS-PRO-003: Internal Audit Procedure
- SW-IMS-PRO-004: Management Review Procedure
- SW-IMS-PRO-005: Nonconformity and Corrective Action Procedure
- SW-IMS-PRO-009: Continual Improvement Procedure
- SW-QMS-PRO-002: Customer Feedback Procedure
Policies:
- SW-IMS-POL-001: Integrated Management System Policy
- SW-QMS-POL-001: Quality Policy
- SW-EMS-POL-001: Environmental Policy
- SW-ISMS-POL-001: Information Security Policy
Forms:
- SW-IMS-FRM-002: Improvement Suggestion Form
- SW-IMS-FRM-007: Corrective Action Request (CAR) Form
- SW-IMS-FRM-008: Nonconformity Register
- SW-IMS-FRM-009: Improvement Register
ISO Standards:
- ISO 9001:2015 - Clause 10 (Improvement)
- ISO 14001:2015 - Clause 10 (Improvement)
- ISO 27001:2022 - Clause 10 (Improvement)
Document Control
| Version | Date | Author | Changes |
|---|---|---|---|
| 1.0 | [TBD] | [Author] | Initial release |
Approval
| Role | Name | Signature | Date |
|---|---|---|---|
| IMS Owner | |||
| CEO |